MAIF
MAIF – National framework contract, Lot 11 Electrical
Multi-regional interventions in MAIF branches (Grenoble, Nice, Lyon, Aix, Marseille…) under the Stratégie Des Lieux programme.
Portfolio
Demanding projects across multiple sectors throughout the region.
MAIF
Multi-regional interventions in MAIF branches (Grenoble, Nice, Lyon, Aix, Marseille…) under the Stratégie Des Lieux programme.
SPL M TAG
Electrical installations for the Gières, Eybens, Sassenage depots and Échirolles headquarters.
GreenAlp
Rehabilitation of ~30 rising mains, 600+ branches. Safety and performance upgrades.
Jean Lain Mobilités
8,000 m², 2,000 A, 6 main switchboards. Installation of 4 × 300 kW EV charging stations.
Jean Lain Mobilités
Complete electrical fit-out of a new car dealership in the Alps.
Fondation Boissel
2,700 m² medical premises. LV power, low-current, fire safety and access control.
CIAS
3,000 m² care home. Electrical upgrades and category A fire detection system.
Pôle Sao Paulo
7,600 m²: medical centre, offices and retail. Complete LV/low-current installation.
Université Grenoble Alpes
3,000 m² of refurbished university premises with full VDI and low-current network upgrade.
Université Grenoble Alpes
5,500 m² electrical renovation on the Grenoble campus with live-environment constraints.
Commune de Pallud
Full electrical renovation and installation of a self-consumption solar PV plant.
Commune d'Entraigues
Complete electrical renovation and compliance upgrade.
CCAS
New-build multi-accueil daycare: LV power, low-current, category B fire safety.
Minimistan
Conversion of the Couvent des Minimes in Grenoble into a bar-restaurant-coworking-hostel (Minimistan). LV, low-current, VDI, fire safety, access control.
REXEL / CEDEO
Construction of 5 commercial buildings (REXEL, CEDEO, CLIM+, TÉREVA, KNUCHEL). LV/low-current, VDI, intruder alarm, access control, fire safety.
Sowatt Solutions
Complete delivery of an EV charging station with timber-frame solar canopy: 44 kWc PV, 3×360 kW ultra-fast chargers, 1×54 kW charger, lighting and CCTV.
SEM SEDEV
Commercial complex in a ski resort, with occupied-premises constraints.
Hôtel Cervolan – LX Capital
Full renovation and extension of electrical installations. LV power, low-current, fire safety.
Résidence Shana
All electrical lots for a new hotel residence: LV power, low-current, fire safety, EV charging.
SEM Les 3 Vallées
Construction of a mountain lodge and tourist office in a ski resort. LV power, low-current, fire safety.
Banque Populaire +x AURA
Refurbishment of the head office and branch (8,000 m²). LV power, low-current, VDI, fire safety. Main contractor: Bouygues Bâtiment.
Walibi
Full electrical fit-out of the new Mahuka roller-coaster environment (2,000 m²). LV power, low-current, fire safety, scenic lighting.
No projects in this sector.
Your privacy
We use strictly necessary cookies for site operation (language preferences, consent). No advertising or third-party tracking cookies. Learn more